Phillips Semiconductors needed to expand their manufacturing capacity as well as upgrade their facilities systems for new, larger 200mm wafer manufacturing equipment. The CPI Group served as the CM/GC on the project providing construction oversight, quality assurance, cost control and scheduling. This fast-track project included a number of complex industrial systems:

  • Addition of new 650 gpm Process Cooling Water system
  • Addition of new 365 gpm Rinse Water Recycle system
  • Upgrade of Solvent Exhaust abatement system to new 45,000 cfm system
  • Addition of new 34,000 cfm Ammonia Exhaust system
  • Addition of new 1,000 kva emergency generator and synchronizing gear
  • Addition of vacuum assist and upgrade of Clean Dry Air system
  • Upgrade of Reheat Water system
  • Installation of SCADA factory monitoring system and conversion of existing data
  • Addition of new 1,250 ton chiller and cooling tower

Every utility system in the plant was affected by the project – either through direct upgrade or by associated maintenance activities during the planned shutdowns. Several innovative solutions were developed including a new rinse water recycling system that saved Phillips millions of gallons of water per year and a new VOC Regenerative Thermal Oxidizer built over the existing loading dock.

As part of the larger utility upgrade, CPI finished out two additional cleanroom spaces, a Class 3 manufacturing space and a Class 5 sort-test space. A new 36,000 square foot office space was also constructed allowing for additional personnel needed for the expanded operation.

  • 1,200 sf of class-1 cleanroom
  • 3,000 sf of class-100 cleanroom
  • 10 associated process utility systems
  • 36,000 sf of office space
  • $28 million project